04-04-2025, 01:22 PM
(This post was last modified: 04-09-2025, 02:04 AM by sentap.
Edit Reason: add download samples link
)
Update: The original buyer failed to meet the deadline. The 500+ GB of PCL data (including Tunney's Pasture ESAP project files) is now open for sale to other interested parties. Starting price: $175,000 in Monero. Serious inquiries only.
![[Image: PCL-Const-Logo-CB.png]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/BbX3W7kH/PCL-Const-Logo-CB.png)
In this offering, i present a unique collection of over 500 GB of Data extracted from the domain pcl.com, directly linked to critical infrastructure projects of PCL Constructors Canada Inc. The data includes technical documents, blueprints, environmental reports, execution plans, and confidential information from the Tunney's Pasture Energy Services Acquisition Program Modernization Project (ESAP) in Ottawa, Canada. This project, overseen by the Canadian government (PSPC) and executed in collaboration with prominent firms like Innovate Energy, WSP, and Paterson Group, is part of a regional energy infrastructure modernization initiative, upgrading heating, cooling, and drainage systems for a complex of government buildings.
![[Image: SW-MP-Discharge-Locations-2021-04-28-page-0001.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/zqLvc2Jv/SW-MP-Discharge-Locations-2021-04-28-page-0001.jpg)
![[Image: PH4202-Proposed-Sampling-Locations-PCL-C...e-0002.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/2r93TNNg/PH4202-Proposed-Sampling-Locations-PCL-Comments-page-0002.jpg)
![[Image: PH4202-Proposed-Sampling-Locations-PCL-C...e-0001.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/RV2Sm9MF/PH4202-Proposed-Sampling-Locations-PCL-Comments-page-0001.jpg)
![[Image: PCL-BE170056-Cliff-V19-Nov-29-2018-AShem...c-Plan.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/WpWp9gC0/PCL-BE170056-Cliff-V19-Nov-29-2018-AShema-Site-Logistic-Plan.jpg)
![[Image: 2025-04-04-161844.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/Dfs56P8M/2025-04-04-161844.jpg)
![[Image: Civil-Comparison-33-SI-001-page-0009.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/3xPdtmyt/Civil-Comparison-33-SI-001-page-0009.jpg)
![[Image: 2025-04-04-161914.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/qMTw56KM/2025-04-04-161914.jpg)
![[Image: 2025-04-04-161959.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/y86PVqnM/2025-04-04-161959.jpg)
![[Image: 2025-04-04-161627.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/3NgBwYsT/2025-04-04-161627.jpg)
![[Image: 2025-04-04-161458.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/tTnkLhD7/2025-04-04-161458.jpg)
![[Image: 2025-04-04-161419.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/Gp5z7MFZ/2025-04-04-161419.jpg)
![[Image: 2025-04-04-161245.jpg]](https://external-content.duckduckgo.com/iu/?u=https://i.postimg.cc/43dB1C96/2025-04-04-161245.jpg)
4D[/align]
├── CLIFF Shared 4D files
├── Exported 4D Che Files
└── NAHQ ESAP MODELS
Shared
├── 10 Ottawa
│ ├── Projects
│ │ └── 10000253
│ │ └── External
│ │ ├── 4D
│ │ ├── BGIS
│ │ ├── CLIFF - INTERACTIVE DISPLAY
│ │ ├── Consultants
│ │ ├── Contract Documents
│ │ ├── DFQ SHARE FILE
│ │ ├── EQUANS
│ │ ├── EXTERNAL FILE TRANSFER
│ │ ├── HSE
│ │ ├── Inflector
│ │ └── Lebreton Drawings
└── Environmental
├── Construction Meter Readings
├── CONSTRUCTION SAMPLING REPORTS
├── EASR DOCUMENTATION
├── Monthly Discharge Reports
├── SSA
│ ├── Sample Report
│ └── Tunney's Campus Discharge Locations
└── STANDARDS LAB VIBRATION MONITORING REPORTS
└── RECORDED VIBRATIONS
CLIFF - INTERACTIVE DISPLAY
├── AH
│ ├── 2021.03.24
│ ├── JC
│ ├── Look Aheads
│ ├── Naloxone
│ └── NL
├── CLIFF PLANNING - HIGH LEVEL
│ ├── Big Picture Planning
│ │ ├── Upper Plateau
│ │ └── Planning
│ └── DRONE - SITE SCAN
│ ├── April 2021
│ └── March 2021
├── LIFT DRAWINGS
├── LOOK AHEAD SCHEDULES
│ ├── 4 WEEK LOOK AHEADS
│ └── 6 MONTH LOOK AHEADS
│ └── April 2021
├── Enbridge
├── Temp Power
└── UPPER PLATEAU SERVICE TRENCH
├── Renderings
├── CLIFF
├── NPB
├── TUNNEYS
├── Safety
├── Shop Drawings
├── Walters
├── Site Tours
│ ├── Drone Shots
│ └── Mock Ups
└── SITE PLANS
└── Spool Delivery - May 12, 2021
Consultants
├── Algonquin Bridge
│ ├── 33% - First Draft
│ ├── Request for Design Services
│ └── art ENGINEERING
├── BBB
│ ├── bbb renderings 2020
│ ├── BECx Coordination
│ ├── CLIFF SITE OFFICE - For Permit Preparation
│ ├── CLIFF VEC Dump Folder
│ ├── Confed
│ ├── Confed Demo Sketches
│ └── CRX 0052 - CLIFF Security Infrastructure
├── MG CHCP
│ ├── CN-207 - MG CHCP TCL Reinstatement
│ │ ├── 10000253-MG-Temp Construction Lab
│ │ └── Temporary Cache Files
│ ├── Door Hardware Submittal
│ └── MG CHCP Progress Photos - Drone Shots
│ ├── 2022
│ ├── 2023
│ └── 2024
├── MODEL FILES
│ ├── VERBAL CANOPY MODELS CLIFF
│ └── WALTER'S STRUCTURAL STEEL MODEL CLIFF
├── NPB PUMPHOUSE
│ ├── ARCHITECTURAL FENCING PHOTOS
│ ├── Cladding Installation
│ ├── DRONE PHOTOS
│ ├── Green Roof Installation
│ ├── High River Water
│ ├── Retaining Wall Photos
│ ├── Roofing on Hatches
│ └── ROOFING PHOTOS
├── PCL DRONE SURVEY POINT CLOUDS
├── PCL SITE LOGISTICS PLANS
└── CLIFF CHCP
├── Stage 1
├── Stage 2
├── Stage 3
├── Confed
├── NPB and PH
├── NRC
├── PFS
│ ├── TP Master Development PSPC Upload
│ ├── TP Photo's of OLD BLDG. DWGS
│ ├── Triodetic Photos
│ ├── Tunney's Progress Photos
│ └── TUNNEY'S SITE OFFICE - For Permit Preparation
├── BluMetric
├── BTY
├── CJE
├── Commissioning
├── Cooke
├── Corrin
├── Design & Systems
├── MIKE BUCKLEY
├── PATERSON
├── PCL BUILDING SCIENCE SME
├── PCL SURVEY
├── PFS
├── PSPC
├── Razzmal Group
├── Rhea Group
├── Simo
├── Tetra Tech - BHC
└── WSP
Contract Documents
├── BIM/CHCP
└── CLIFF CHCP
├── 33%
├── 66%
├── 99%
├── IFC
├── IFC (SI-001)
│ ├── Issued for Building Permit
│ ├── Issued for DEMO Permit
│ └── Issued for FOUNDATION Permit
├── MODEL UPDATES
│ ├── 2020-11-09
│ ├── 2020-11-13
│ └── 2020-12-04
├── SI-CF-0002 - RFI Coordination and Clarification
│ └── MODEL FILES
├── SI-CF-0003 - Hydro Duct Bank, Elevator
├── SI-CF-0004 - Exhaust Plenum, Retaining
├── SI-CF-0006 - Finishes and Schedules
├── SI-CF-0007 - Bird Frit Pattern
├── SI-CF-0008 - Washroom Access
├── SI-CF-0009 - Fire Rating Revisions
├── SI-CF-0010 - Bus Shelter, Wet Well and N
├── SI-CF-0011 - Ceiling Assembly and Lighting
├── SI-CF-0012 - Lower Plateau Landscape R
├── SI-CF-0013 - Piping Support for Levels B
├── SI-CF-0020 - ARCHITECTURAL SPECIFICATIONS
├── SI-CF-0021 - L2 and L2A Piping Support
├── SI-CF-0022 - L2M Mezzanine Revisions
├── SI-CF-0023 - General Changes
├── SI-CF-0024 - PCR 073 Security
├── SI-CF-0025 - Bench Lighting
├── SI-CF-0026 - CLIFF Climb and VEC Update
├── SI-CF-0027 - Upper Plateau Trench Design
├── SI-CF-0028 - VEC Vestibule Ceiling + Misc
├── SI-CF-0029 - Fire and Gas Alarm Cause &
├── SI-CF-0030 - VEC Lighting
├── SI-CF-0031 - HVAC Spec Update
├── SI-CF-0032 - IO-Link Package
├── SI-CF-0033 - PCR-063 Pumps
├── SI-CF-0034 - Water Service Updates
├── SI-CF-0035 - South West Exit Revisions
├── SI-CF-0036 - AHU Fuel Cooler PV
├── SI-CF-0037 - Heat Trace and Climb Drain
├── SI-CF-0038 - Energy Meter Model Location
├── SI-CF-0039 - Updated P&IDs
├── SI-CF-0041 - EMG
├── SI-CF-0042 - Canted Wall Detailing
├── SI-CF-0043 - ARCHITECTURAL SPECIFICATIONS
├── SI-CF-0044 - Canopy and Hinge Space L
├── SI-CF-0045 - UPDATED INSTRUMENTATION
├── SI-CF-0046 - HVAC UPDATE EAST BUILDING
├── SI-CF-0047 - Pump Base Details
├── SI-CF-0048 - Curbs at Public Elevator Re
├── SI-CF-0049 - Transformer 201-6201-TXR
├── SI-CF-0052 - Piping in Hydro Vault
├── SI-CF-0053 - L3 Lobby & Hydro Vault Ren
├── SI-CF-0055 - CLIFF Climb Detailing
├── SI-CF-0056 - Water Meter Sizing
├── SI-CF-0057 - Top of Hydro Vault Detail
├── SI-CF-0060 - Fan Coils
├── SI-CF-0062 - Trash and Recycle Receptacles
├── SI-CF-0063 - Roof Wall PSSS Base Building
├── SI-CF-0064 - Stainless Steel Specifications
├── SI-CF-0067 - CLIFF Upper Plateau Buried F
├── SI-CF-0068 - CLIFF Column Base Detailing
├── SI-CF-0069 - Vacuum Breakers, Vents to
├── SI-CF-0073 - Generator and Exhaust of C
├── SI-CF-0083 - Fire Shutter
├── SI-CF-0084 - L3 Meeting Room & L2 Shaft
├── SI-CF-0086 - PCR-064 Boilers
├── SI-CF-0088 - Heat Trace and Climb Drain
├── SI-CF-0089 - HVAC and P&IDs Update (U
├── SI-CF-0092 - FC-19-EF-31
├── SI-CF-0095 - Miscellaneous Details and f
├── SI-CF-0096 - CLIFF Triodetic Curb North o
├── SI-CF-0098 - Vent for Equipment
├── SI-CF-0099 - Vents
├── SI-CF-0103 - CLIFF Upper Plateau Sign Fou
├── SI-CF-0104 - CLIFF Emergency Generator E
├── SI-CF-0109 - CLIFF Phase 2 Updates
├── SI-CF-0112 - Degassing, Pressurization &
├── SI-CF-0113 - L1 Chiller Stiffeners
├── SI-CF-0114 - Generator Exhaust Slab Ope
├── SI-CF-0115 - Copper Wall Cladding
├── SI-CF-0116 - Bellmouth Realignment
├── SI-CF-0118 - Hydro Vault Mechanical Ven
├── SI-CF-0120 - Island Mode Functional Con
├── SI-CF-0121 - CLIFF Triodetic Plant Phase 1
├── SI-CF-0124 - CLIFF Fuel P&ID Update
├── SI-CF-0125 - CLIFF CHCP SECTION 25 Spec
├── SI-CF-0127 - Chilled Water Functional Co
├── SI-CF-0128 - Miscellaneous Details and F
├── SI-CF-0130 - Condensate Collecting Tan
├── SI-CF-0131 - CLIFF Plant Phase 2 Triodetic
├── SI-CF-0132 - PSS Basement and L1 Detail
├── SI-CF-0133 - Life Safety
├── SI-CF-0135 - CLIFF Gas Pressure Change
├── SI-CF-0136 - Travelling Screen Drain Ope
├── SI-CF-0137 - Fuel Oil Piping Arrangement
├── SI-CF-0138 - Chiller Floor Removable Sla
├── SI-CF-0139 - Sump Venting Updates
├── SI-CF-0140 - Phase 2 Perimeter Detail
├── SI-CF-0141 - Phase 2 Perimeter Detail
├── SI-CF-0144 - Condensate Tank Make-up
├── SI-CF-0155 - Heat Tracing Controller
├── y - Current
[align=left] └── z - SI-0001 Markup
- PCL Constructors Canada Inc.: One of North America's largest construction contractors, with a history of executing multi-billion-dollar projects. The pcl.com domain hosts not only ongoing project details but also sensitive corporate data, access to which could reveal strategic and competitive intelligence.
- ESAP Project: Aimed at revamping energy infrastructure in Tunney's Pasture, this project involves installing pipelines, tunnels, advanced drainage systems (e.g., TopSlot System), and heavy machinery (e.g., chillers and pumps). Its proximity to the Ottawa River and environmental sensitivity make it both technically and politically significant.
- Data Utility: This dataset can be used for competitive analysis, exploiting operational vulnerabilities, or even disrupting government projects. Detailed design and scheduling information may expose critical weaknesses in the project.
Data Contents:
- Technical Blueprints & Schematics:
- Site logistics maps (CLIFF-SL-01A) detailing construction phases, crane positions, and safety zones.
- Tunney's Pasture utility maps (water, sewage, gas, and energy lines).
- Trench design specifics (CFd Center Block Trench Package) at 99% completion.
- Site logistics maps (CLIFF-SL-01A) detailing construction phases, crane positions, and safety zones.
- Confidential Documents:
- Ottawa city wastewater agreements with discharge specifications and flow rates.
- Groundwater quality reports including pH and TSS levels.
- Vibration monitoring records for protecting sensitive structures.
- Ottawa city wastewater agreements with discharge specifications and flow rates.
- Technical Specifications:
- TopSlot Drainage System (SUM-01280) with installation details and load class A15-C250.
- Skidding System for equipment relocation (250-ton compression, 150-ton traction capacity).
- Mechanical & fire safety specs (Innovate Energy, Feb 2023) covering operational pressures and temperatures.
- TopSlot Drainage System (SUM-01280) with installation details and load class A15-C250.
- Scheduling & Planning:
- Mechanical equipment deployment plans tracking chillers, pumps, and fuel systems.
- List of 44 buildings connected to the energy grid (93.6% completion).
- Mechanical equipment deployment plans tracking chillers, pumps, and fuel systems.
- Environmental & Operational Data:
- Wastewater self-monitoring reports (R.W. Tomlinson) and vibration logs (Standards Lab).
- Drone footage and progress documentation (2022-2024).
- Wastewater self-monitoring reports (R.W. Tomlinson) and vibration logs (Standards Lab).
Strategic & Technical Value:
- Precision & Completeness: The data includes exact technical specs (e.g., 1600 kPa design pressure for LTHW/CHW systems) and execution blueprints, enabling full project reconstruction or analysis.
- Sensitivity: Contains environmental data (water quality, drainage), execution timelines, and potential weak points (e.g., pump installation delays), useful for disruption or exploitation.
- Applications: Ranges from corporate espionage by competitors to infrastructure vulnerability mapping by adversarial entities.
Access Details:
- Total Volume: 500+ GB, including PDFs, DWG files, high-res images, and 3D models (e.g., Walter's Structural Steel Model).
Pricing:
- Base Price: $175,000 (payment in BTC or XMR).
- Justification: The massive data volume (500+ GB), project sensitivity (government infrastructure), and comprehensiveness (design to execution) align with the market value of similar multi-million-dollar projects.
- For inquiries, reach out via secure message. Unprofessional or technically uninformed requests will be ignored.
![[Image: SPWrt0B.gif]](https://external-content.duckduckgo.com/iu/?u=https://i.imgur.com/SPWrt0B.gif)